Salem USD


Salem Township (Township) has established an Urban Services District (USD) for development of residential and commercial areas within the Township.  The designated USD consists of approximately 1,400 acres of land within Sections 25, 26, 35, and 36 of Salem Township and Specifically bounded north by North Territorial Road, west by the eastern 1/2 of Section 26 (north of M-14), west by the easten 1/2 of Section 35 (north and south of M-14), south by Joy and Ann Arbor Roads, which are the southernmost section lines of Sections 35 and 36, and east by Napier Road.  
 
The USD is designated to receive public water and wastewater services.  Water supply will be provided from the Great Lakes Water Authority (GLWA) while sanitary sewer service for the USD is anticipated to be provided by the Ypsilanti Community Utilities Authority (YCUA).
 
The Township received a $20 Million Michigan Economic Development Corporation (MEDC) Grant to fund design and construction of water and sewer utilities.  The design of three phases of water and sewer utilities was initiated in 2019 and is still in progress.  Engineering design for USD Phase 1 is complete and construction is underway.  Design and permitting for water and sewer utilities to serve Phases 2 and 3 of the USD continues.  The USD project phases can be viewed in the attached figure.

 
USD PHASE 1 CONSTRUCTION PROJECT   
 
General information
 
Owner:                     Salem Township 
 
Engineer:                Stantec Consulting
 
Contractor:             Stante Excavating, Inc 
 
Project Cost:           $8,557,815.00 - Includes Phase 2 & 3 water and sanitary force main under M-14
 
Funding:                  MEDC Grant
 
 
PROJECT OVERVIEW
Phase 1 of the Salem Township USD includes connection to an existing 60-inch diameter GLWA water main to a water booster station located at the northwest corner of Napier and Ann Arbor Roads.  From the new booster station, 16-inch (along Joy and Gotfredson Roads) and 12-inch (along Napier Road) transmission mains will supply municipal water to the USD.  Engineering plans for the new USD water system infrastructure can be viewed here:                                 
                           Booster Station Site Plan          Water Booster Station Building           Watermain along Napier Road 
                                                    Watermain along Joy Road                Watermain along Gotfredson Road 
 
Phase 2: Constructing an additional 4,400 feet of watermain continuing north on Gotfredson and under M-14 to the future water tank site and 1,780 feet of sanitary force main under M-14.  Phase 2 Watermain along Gotfredson Road
Phase 3: Constructing additional 3,500 feet of watermain continuing north on Gotfredson from the future water tank site to North Territorial Road. Phase 3 Watermain along Gotfredson Road
 
PROJECT SCHEDULE
Construction starts:  July 2020
Construction completed: October 2021
 
 
PROJECT UPDATE
Installation of the Phase 1 water main is mostly complete. Construction of the water booster station and connection to the GLWA water main is progressing with an August 2021 startup date. Phase 2 and 3 water system construction is underway with installation of water main and sanitary force main under M-14 to be completed by January 2021. 

Amended Memorandum of Understanding regarding PUD Rights and Obligations please click here to view document

SALEM TOWNSHIP
9600 Six Mile Road
P.O. Box 75002
Salem, MI 48175

Phone: 248-349-1690
Fax: 248-349-9350



Contact Us


 

Booster_Station
Booster_Station_2
IMG_2514
IMG_2518
IMG_3114
IMG_3704
IMG_5199
IMG_5203
IMG_5261
IMG_5285
IMG_5394
ROW_Ann_Arbor_Road
ROW_Joy_West_ITC_2